Plumbing requirements for the drip system must be identical to the picture below
The first picture is a side view and the second is a top-down view of the plumbing manifold which must be installed horizontally
The cost of the water meter and installation charges will be invoiced to the homebuilder
The curbstop must be above-grade and marked with a post or angle iron
Below is a diagram of the water system
*please ensure that the water tank is cleaned and vacuumed. Remove all plastic, wood, construction materials, bugs and other debris as it will contain potable water